Our foundation casting team is built on three core values: diligence, responsibility and collaboration. Diligence is at the heart of our work. We take care of every detail to ensure high quality of work and longevity of the building. Responsibility is our business ethics.


We undertake to work responsibly and transparently, in accordance with established schedules and budgets. Bendradarbiavimas yra mūsų komandos jėga. We value each member's contribution and foster an open, constructive collaborative atmosphere to achieve the best results.
How the work goes
- 1
Enquiry
Call us or fill in the form. We discuss what you need.
- 2
Site visit & estimate
We visit the site, take measurements and prepare a detailed estimate.
- 3
Contract & works
We sign a contract with deadlines and start. You are kept informed throughout.
- 4
Handover
We inspect the result together, clean up the site and hand it over.
Frequently asked questions
Kiek laiko trunka pamatų liejimo darbai?
The duration of foundation casting depends on their type (strip, flat, pole), site conditions and weather. As a standard, works last from a few days to 2 weeks. This includes preparatory work, formwork, rebar tying and concreting.
When can you start building walls after pouring the foundation?
Depending on the weather conditions and the grade of concrete, the concrete hardens completely within 28 days. However, construction can usually be started after 7-10 days if the foundations are sufficiently dry and have maintained the required strength.
Ar galima lieti pamatus žiemą?
Yes, foundations can be poured in winter, but this requires special measures - antifreeze additives for concrete, heated formwork or thermal tarpaulin curtains are used. It is also necessary to ensure that the ground is not frozen. For these reasons, winter concreting costs more and requires more maintenance.