We offer various forms of foundation casting services. Foundations can be of several types depending on the soil, location and your preferences and requirements.

Foundation pouring in Vilnius

Our foundation casting team is built on three core values: diligence, responsibility and collaboration. Diligence is at the heart of our work. We take care of every detail to ensure high quality of work and longevity of the building. Responsibility is our business ethics.

Foundation pouringFoundation pouring

We undertake to work responsibly and transparently, in accordance with established schedules and budgets. Bendradarbiavimas yra mūsų komandos jėga. We value each member's contribution and foster an open, constructive collaborative atmosphere to achieve the best results.

How the work goes

  1. 1

    Enquiry

    Call us or fill in the form. We discuss what you need.

  2. 2

    Site visit & estimate

    We visit the site, take measurements and prepare a detailed estimate.

  3. 3

    Contract & works

    We sign a contract with deadlines and start. You are kept informed throughout.

  4. 4

    Handover

    We inspect the result together, clean up the site and hand it over.

Frequently asked questions

Kiek laiko trunka pamatų liejimo darbai?

The duration of foundation casting depends on their type (strip, flat, pole), site conditions and weather. As a standard, works last from a few days to 2 weeks. This includes preparatory work, formwork, rebar tying and concreting.

When can you start building walls after pouring the foundation?

Depending on the weather conditions and the grade of concrete, the concrete hardens completely within 28 days. However, construction can usually be started after 7-10 days if the foundations are sufficiently dry and have maintained the required strength.

Ar galima lieti pamatus žiemą?

Yes, foundations can be poured in winter, but this requires special measures - antifreeze additives for concrete, heated formwork or thermal tarpaulin curtains are used. It is also necessary to ensure that the ground is not frozen. For these reasons, winter concreting costs more and requires more maintenance.

Free consultation

Tell us about your project

We will discuss the scope, visit the site and prepare a clear estimate with quantities and deadlines.

We reply on business days. Your details are used only to answer your enquiry.

Call Get a quote