We remove all types of surfaces including tiles, plaster, wallpaper, flooring and more. We take the construction waste to the construction waste container.


If you are planning to renovate, repair or change the layout of the premises, interior demolition work is likely to be required. It is not advisable to do this yourself, especially if you do not know which walls need to be demolished and which are not, or if you do not understand the characteristics of each object to be demolished.
How the work goes
- 1
Enquiry
Call us or fill in the form. We discuss what you need.
- 2
Site visit & estimate
We visit the site, take measurements and prepare a detailed estimate.
- 3
Contract & works
We sign a contract with deadlines and start. You are kept informed throughout.
- 4
Handover
We inspect the result together, clean up the site and hand it over.
Frequently asked questions
Can partitions be demolished without a permit?
If the partition is not a retaining wall, a permit is usually not required. However, it is always a good idea to consult with the constructors or architect to make sure that the demolition will not affect the structure of the building. Demolition of load-bearing walls requires a project and permission.
How long does interior demolition work take?
It depends on the scope of the work - demolishing simple partitions can take 1-2 days, and more complex demolishing (for example, with brickwork, breaking up the floor or dismantling the bathroom) - up to several days. Garbage removal should also be included.
Does interior demolition cause a lot of dust and noise?
Yes, demolition work is noisy and dusty. It is recommended to protect the rest of the premises with a film, to use vacuuming equipment, and if the work is carried out in an apartment building, to inform the neighbors and follow the rules for noise reduction.