Fitting out a shell apartment: the right order of work

A new apartment with partial finishing means bare walls, concrete floors and the main services brought in. There is a lot to do before you move in, and the order matters: get it wrong and you end up tearing out work that is already finished.
1. Plan and design
First decide where the furniture and kitchen appliances will stand and where you will need sockets and lights. An interior design project pays for itself because the electrical and plumbing points end up in the right places from the start.
2. Partitions and layout changes
If you are changing the layout, partitions are built or removed first. They are most often made of plasterboard with sound insulation.
3. Electrics and plumbing
Electrical cables are run and water and drainage points are installed, plus additional ventilation if needed. All of this is hidden in the walls and ceilings, so this stage must be finished before the finishing work begins.
4. Ceilings
Suspended or stretch ceilings are installed, with provision for recessed lights and curtain tracks.
5. Wall preparation
The walls are filled, sanded and primed. How the painted walls look depends on how carefully this is done, especially under side lighting.
6. Tiling
Tiles are laid in the bathroom, toilet and kitchen work area. Before that, waterproofing must be applied in the wet areas.
7. Painting
Walls and ceilings are painted before the floor is laid, so the flooring is not splashed with paint.
8. Floors and doors
The flooring is one of the last things to go in, followed by interior doors and skirting boards.
9. Final work
Switches, sockets, light fittings and sanitary ware are installed. Finally, the apartment gets a post-construction clean.
How long it takes
The duration depends on the size of the apartment and the complexity of the solutions. Work goes most smoothly when one team does every stage: there are no separate tradespeople's schedules to coordinate and no arguments about who is to blame for mistakes.
We carry out complete apartment finishing in Vilnius, from the design to the last skirting board. Write to us and we will prepare an estimate for your apartment.
Advice before you build or renovate
2026-11-20Timber-frame or masonry house: which to choose?We compare the two most popular house-building technologies by build speed, warmth, sound insulation and maintenance.Read
2026-11-20Removing a load-bearing wall in an apartment: what to know before you startWant to open the kitchen to the living room? We explain how a load-bearing wall differs from a partition and how this…Read
2026-11-20How to choose a building contractor: 8 questions before you signQuestions worth asking every contractor to avoid rising costs and slipping deadlines.Read Tell us about your project
We will discuss the scope, visit the site and prepare a clear estimate with quantities and deadlines.
- +370 604 07771
- info@impulseconstruction.eu
- Giedraičių g. 39, R53, Vilnius
- Mon–Fri 9:00–18:00