House construction stages: from the plot to the keys

Building a house for the first time means making hundreds of decisions. Once you know which stages lie ahead and in what order they happen, it is easier to plan your budget and time. This is what building a private house usually looks like.
1. Design and permits
Everything starts with a site analysis and the design. An architect prepares the house design, the structural and building-services sections are drawn up, and the building permit is obtained. This is the right moment to prepare a cost estimate: changing the design on paper is far cheaper than changing it on site.
2. Foundations
The type of foundation is chosen according to the ground and the structure of the house. The durability of the whole house depends on the quality of the foundations, so it is important to prepare the base properly, reinforce it and give the concrete time to cure.
3. Walls and floor slabs
Next the shell goes up: masonry or timber-frame walls, floor slabs, stair openings. At this stage the house takes shape and work moves fastest.
4. Roof, windows and doors
Once the roof is on and the windows and doors are fitted, the house is weathertight. From here on, interior work no longer depends on the weather.
5. Facade
Facade insulation and finishing determine the energy efficiency and appearance of the house. This work is best done in the warm season.
6. Building services
Inside the house, electrics, water supply, drainage and heating, and ventilation are installed. All these systems need to be coordinated with one another at the design stage.
7. Floors, plaster and interior finishing
The floors are poured, the walls are plastered and plasterboard is installed. Then comes the finishing: filling, painting, tiling, flooring and interior doors.
How long does construction take?
Building a private house usually takes between six months and a year. The timeline depends on the size of the house, the chosen technology, the season and how smoothly the work is coordinated. When one team carries out every stage, there is no waiting for one contractor to make way for the next.
Planning to build a house in Vilnius or the surrounding area? Tell us about your plot and design, and we will prepare an estimate and a work schedule.
Advice before you build or renovate
2026-11-20Fitting out a shell apartment: the right order of workBought a new apartment with partial finishing? This is the order in which the work is done so that nothing has to…Read
2026-11-20Timber-frame or masonry house: which to choose?We compare the two most popular house-building technologies by build speed, warmth, sound insulation and maintenance.Read
2026-11-20Removing a load-bearing wall in an apartment: what to know before you startWant to open the kitchen to the living room? We explain how a load-bearing wall differs from a partition and how this…Read Tell us about your project
We will discuss the scope, visit the site and prepare a clear estimate with quantities and deadlines.
- +370 604 07771
- info@impulseconstruction.eu
- Giedraičių g. 39, R53, Vilnius
- Mon–Fri 9:00–18:00